Temperature settings: | 40-110°C |
Humidity adjustment: | 20-95 rH |
Time setting: | 1-6 or 1-12 hours |
Delayed start: | 0-12 hours |
Lighting control | |
Cable length: | 5 m. |
Connection: | 400V 3- phase. |
Max load display for unit | 11 kW |
Max loat display for steam generator | 3 kW |
Max loat for lighting | 100W 230V 1- phase. |
The sensor has an overheating protection with reset function and uses an NTC thermistor. 22kΩ / T = 25 °.